Skip to content

02Process

How a project runs.

Five stages. You sign the drawings and the materials before work starts, and walk the house with us at handover.

  1. Stage 01

    Site visit and brief

    We walk the site with you, measure it, and write down what the space has to do and who it is for.

    You receive
    [What you receive, e.g. measured plan and written brief]
    Time
    [Typical duration]
  2. Stage 02

    Design

    Layouts, elevations and 3D views. We revise them with you, and you sign the final set before anything is cut.

    You receive
    [Drawings and views you receive] · [Revision rounds included]
    Time
    [Typical duration]
  3. Stage 03

    Material sign-off

    Every board, laminate, stone and fitting is shown to you and recorded by grade before it is ordered.

    You receive
    [Whether you get a written material schedule, and what it lists]
    Time
    [When the materials are agreed]
  4. Stage 04

    Execution

    We run the build from the drawings: carpentry, finishes, stone, lighting and the craft work.

    You receive
    [How often you get updates] · [Who your site contact is]
    Time
    [Typical duration]

    From site

    • Pooja unit under protective film with a paper template of the arch taped in place
      A paper template of the arch, taped to the pooja unit
    • Feature wall with inlay strips held by tape while the adhesive sets
      Inlay strips taped while the adhesive sets
    • Wardrobes built around a window seat under new linear ceiling lights
      Wardrobes wrapping a window seat, ceiling lights in
    • Wardrobe wall with shutters and handles fitted and work stools still in the room
      Shutters hung, handles on, stools still in the room
  5. Stage 05

    Handover

    A final walkthrough against the drawings, snags closed, then the keys. [If the family has a griha pravesam date, how we plan handover around it]

    You receive
    [Warranty or after-care terms] · [What happens after handover]
    Time
    [How long snagging takes]

    A jaali screen strung with marigold on the day of the griha pravesam.

02.1Site diary

A kitchen before and after the last fittings.

  1. Kitchen with gloss shutters and framed glass uppers, two pendants lit and loose wires for a third
    Fig. K.1Shutters and glass uppers fitted, two pendants lit, wires out for a third.
  2. The same kitchen from the other side, plinth light on, labels still on the tiles
    Fig. K.2Plinth light on, tile labels still on the backsplash.
  3. The finished kitchen with pendants lit over a backlit counter
    Fig. K.3Finished: sink, chimney and pendants in.

02.2How payment works

Fees and payment stages.

[How the quote is written and what it is checked against on site]

Design fee
[How it is charged and when]
Quotation
[Item-wise, against the signed drawings and material schedule]
Payment stages
[Milestones, e.g. on order, on carcass, on handover]
Changes
[How a change after sign-off is priced]
After handover
[Warranty and service visits]

Start a project

Tell us about your space.

A plan, a photo of the site, or just the address. We reply on WhatsApp or call you back.